Maidstone HMP Sports Hall Development
These works were conducted within a live correctional facility, which required in depth logistical and resource planning to be carried out.
.
- Date: November 2023 to November 2024
- Client: ISG
- Project Type: Ministry of Justice
About this Project
This project was the construction of a new sports hall and gym.
Works included concrete foundations and holding down bolts for steel frame, new concrete ground floor slab, and full external works inclusive of drainage.
These works were conducted within a live correctional facility, which required in depth logistical and resource planning to be carried out.
The works were completed on time and within budget.
More Projects
Ilford RC Frame
Hatch side school was a new development incorporating an extension for the school
Ipswich Project X Ware house Unit
Project X was the development of one large warehouse unit ...
Maidenhead Multi-story Car Park Development
This project included groundworks, reinforced concrete structures ...
Jays Close Basingstoke Warehouse Unit
This is an extremely complex project with many factors including a 6m retaining wall splitting the site into two ...
East Street Reading Student Accommodation
This project was a newly developed large block of student accommodation in East Street in Reading ...